Reimagining national infrastructure
£75m+
Value of 8-year term project with HPC
No.1
World’s largest turbine delivered by our technical expertise and capabilities
6%
UK electricity supply via our electrical and instrumentation installations
Hinkley Point C (HPC) is far more than a construction site; it is a nationally significant infrastructure project that anchors the UK’s transition to net zero. Developed by EDF and CGN, HPC is designed to supply 6% of the nation’s electricity and demonstrates the breadth and depth of M Group’s capabilities.
We have brought together our capabilities in digital infrastructure, complex engineering and highways to deliver on a single, critical project.
M Group’s unique connected capabilities, from across our divisions, are vital to the success of HPC. Telent is the principal telecommunications partner, designing, delivering and operating the secure digital infrastructure that keeps the nuclear site connected, safe and operational.
BGEN delivers complex mechanical, electrical and commissioning works, while our Highways team provides civils and access infrastructure needed to support construction logistics and safe movement. This range of capabilities saw us harness our technical expertise and lead the multidisciplinary electrical and instrumentation installations for the world’s largest turbine.
Hinkley Point C showcases how M Group has harnessed its capabilities to deliver work that separate entities could not achieve. By unifying our portfolio we operate as one cohesive unit, linking capabilities across the infrastructure ecosystem. BGEN’s 1,100 experts collaborate with our existing businesses, allowing us to become greater than the sum of our parts.
Our success at HPC embodies our mission to reimagine infrastructure for a sustainable future, and demonstrates the operational excellence required to lead the nation’s most vital energy transition projects.