M Group Energy support design and installation of largest Ultra Rapid EV charging hub in Shropshire
- Energy
- 11 Dec 2025

As one of the largest Independent Connection Providers (ICPs) and network infrastructure contractors in the UK, we support transmission and distribution network operators.
We design, build, and maintain overhead lines and transmission substations at voltages up to 400kV, all while supporting system decarbonisation.
We’re working hard to make safe, quality, and sustainable EV projects a reality. We’ve created a dedicated team focused on designing, installing, and maintaining EV and associated electrical infrastructure.